AIB
high-risk speculativeAIB Data Centers Inc. · AMEX
$1.90
-9.31% ·
delayed · iex
Snapshot taken 6 hours ago (Aug 6, 2026, 9:04 AM ET). Stored, not recomputed — prices are as of that moment. Open in the app ↗
Analysis offline · deterministic
Transcript evidence shows 1 positive vs 0 negative signal(s) related to "detail". Deterministic offline assessment — corroborate with a hosted model before acting.
- Overall
- 37/100
- Confidence
- 78/100
Catalysts
- ▲ BlockchAIn LLC operations are currently centered around its existing 40 MW data center facility in South Carolina.
Scenarios
Bull 30% · Base 45% · Bear 25%
Bull Catalysts in evidence convert to revenue within horizon.
Bear Financing/dilution risk materializes; catalysts slip.
Technical
- Trend
- neutral
- Tech score
- 42/100
- RSI(14)
- 50.4
- SMA 20/50/200
- 1.85 / 2.04 / —
- MACD
- -0.004
- ATR(14)
- 0.208
- Rel volume
- 0.6
- Avg $ volume
- $69,535.54
- Momentum 20/60/120d
- 8.6% / 58.3% / —%
- From 52w high
- -68.8%
- Golden cross
- no
- Volatility
- high
Fundamentals SEC
- Market cap
- $71.5M
- Shares outstanding
- 37,646,133
- Public float
- 0
- Revenue
- $4.9M
- Revenue growth
- —
- Cash
- $1.3M
- Debt
- —
- Runway
- —
Sources 7
- AIB Data Centers Rings the NYSE Opening Bell to Celebrate Corporate Rebranding and Public Listing
- AIB Data Centers Added to Russell Microcap® Index
- AIB Data Centers Added to Russell Microcap® Index
- BlockchAIn Digital Infrastructure, Inc. Completes Corporate Name Change to AIB Data Centers Inc.
- BlockchAIn Announces Corporate Name Change to AIB Data Centers Inc.
-
SEC exhibit Open ↗8-K/A — BlockchAIn Digital Infrastructure, Inc. (AIB) (CIK 0002070542)
- • acquisition
As of the date of these unaudited pro forma condensed combined financial statements, BlockchAIn has not completed the detailed valuation study necessary to arrive at the required final estimates of the fair value of the Signing Day Sports'
- • acquisition
-
SEC exhibit Open ↗8-K — BlockchAIn Digital Infrastructure, Inc. (AIB) (CIK 0002070542)
- ▲ capacity expansion
BlockchAIn LLC operations are currently centered around its existing 40 MW data center facility in South Carolina.
- ▲ capacity expansion
Prices from iex (delayed). Fundamentals from SEC EDGAR. Indicators computed locally. First covered Aug 6, 2026, 9:04 AM ET.